• Home
  • Background
  • Photo Gallery
  • Web Links
  • Forum
  • Calendar
  • Contact
 
Home TMS 20 Trimaran 8-18-09 Layup and Vacuum Bagging Projects Current Projects TMS 20 Trimaran 8-17-09 Layup and vacuum bagging

Projects

TMS 20 Trimaran
Plans
Strong Back
Mold
Foam
Layup Table - Hot Box
Stern
8-7-09 Fairing Inner Hull
8-18-09 Layup and Vacuum Bagging
8-23-09 First 1/2 of main hull out of mold
10-10-09 Begin Faring Outside
11-16-09 Faring Keel and Side
11-28-09 Faring Deck - Fliping Stations
12-23-09 - faring keel
1-10-10 - Finally Fared out
2-10-10 Port Side Hull
2-14-10 Main Beam Plug
3-1-10 Port Side of main hull
4-7-10 Bulkheads
4-12-10 Hull1/2 Joined
4-16-10 Updated Faring and Vacuum Information
10-30-10 Update
6-3-11 Update Back at it again!
6-9-11 update
6-19-11 update
-------------------------
Archived Projects

Login



  • Forgot your password?
  • Forgot your username?
  • Create an account

8-17-09 Layup and vacuum bagging

View Slideshow

nextlast
Vacuum pump mod-1.JPG

Vacuum pump mod-1.JPG

AC fitting replaced with tubing barb.JPG

AC fitting replaced with tubing barb.JPG

Building manifold.JPG

Building manifold.JPG

holes drilled in 4 inch PVC end cap.JPG

holes drilled in 4 inch PVC end cap.JPG

Holes PVC tubes bogged in with west epoxy.JPG

Holes PVC tubes bogged in with west epoxy.JPG

Inside bogged.JPG

Inside bogged.JPG

Intake to pump routed up.JPG

Intake to pump routed up.JPG

Waste exhaust tube added.JPG

Waste exhaust tube added.JPG

looking inside after the cap is mounted on tube.JPG

looking inside after the cap is mounted on tube.JPG

nextlast
Page: 1 2 3 4 5 6 7

Powered by . valid XHTML and CSS.